Holy Apostles' C of E Primary School
A 10.92 kWp solar installation, completed in August 2025. Funded with Cheltenham Borough Council, and delivered free of charge to the school. The local Member of Parliament visited to see it.

Our community work is hands on. We raise funds ourselves and with our clients and suppliers, then our engineers travel and build the system.
The school's grid supply was unreliable, leaving it dependent on a costly diesel generator. Working with the EDP Trust, we designed a solar and battery system, raised the money with our suppliers and clients, shipped the equipment by sea from Southampton and sent five engineers to install it.
While the team was there it also repaired the storm-damaged roof of a nearby orphanage with Gandy's International.
“Dan immediately offered his services pro bono and came out to visit the school with a promise to get us offgrid.”
Delivered with the EDP Trust, the charity, and our partners: Nanosun Foundation, Dainton Self Storage, Industar, PureDrive Energy and Edmundsons.

92 panels
shipped by sea from the UK and installed by our own engineers
Awutu Winton Senior High School case study




Our next deployment is to Mamankara, a community of more than 400 people with no grid connection. We surveyed the village in March 2026. The team will install an off-grid system for the school and the village: two 8 kW hybrid inverters with 30 kWh (kilowatt-hours) of battery storage.
£8,000raised of a £15,000 target
As at 11th November 2026


A 10.92 kWp solar installation, completed in August 2025. Funded with Cheltenham Borough Council, and delivered free of charge to the school. The local Member of Parliament visited to see it.

A 36.27 kWp solar installation, completed in August 2026 at no cost to the school. The project, over £30,000, was funded mainly by a local benefactor, with a contribution from Potentia.
Potentia is led by former Royal Marines and is a signatory of the Armed Forces Covenant.