Gloucestershire County Council: solar on 50 schools
Principal contractor for 0.5 MWp across 50 sites in the council's solar programme, delivered around the school calendar.

A 10.92 kWp system on the school's flat roof, with nothing through the membrane, and solar panels with battery storage on six almshouses.
Holy Apostles wanted to cut its electricity bills without disrupting the school day.
The system was funded with Cheltenham Borough Council, at no cost to the school.
We designed a 10.92 kWp system for the flat roof: 24 DMEGC 455 W panels on a ballasted K2 mounting system, so nothing goes through the roof membrane. A SolarEdge inverter and panel optimisers let the school see how every panel is performing.
We installed the system in the summer holidays and completed it on 20th August 2025. During testing we found the supply phases at the school's main isolator were wired out of sequence, and we corrected it before handover.
In November 2026 we also installed solar panels and battery storage on six almshouses owned by the Mary Joan Hawley Charity: three 3.72 kWp systems of eight 465 W panels and three 2.79 kWp systems of six, with Solis 6 kW inverters and 10 kWh Solis batteries.
8,000 kWhForecast
a year, most of it used on site during the school day
“The installation of solar panels and battery storage across our six almshouse properties at Hawley Mews has been a really positive step towards reducing our carbon footprint and making the houses more energy efficient. Having previously worked with Potentia, I was very pleased to use them again for this installation. The combination of solar panels and battery storage allows us to generate and store our own renewable electricity, making greater use of the energy we produce, reducing our reliance on the grid and delivering long-term environmental benefits, as well as financial savings for our residents.”
Delivered by the Potentia Engineering team

Principal contractor for 0.5 MWp across 50 sites in the council's solar programme, delivered around the school calendar.

A 26 kWp solar system with 20 kWh of battery storage on the council's Community Hub, which generated 25 MWh in 2025, 51% of the building's electricity use.
Send an address, a drawing or a half-hourly data file. We respond within one working day.