Skip to content
Drone pass over the solar array on the Porta Romana factory roof

Generate your own power and depend less on a market you do not control

What you pay for electricity is set by gas markets, conflict, network charges and policy. A site that generates, stores and controls its own power buys less from that market, knows what most of its energy will cost, and keeps running when the grid does not.

Porta Romana, Farnham

Why it matters now

Energy cost is now a business risk

Payback is one measure of an energy system. The larger question is how much of your energy cost and supply sits outside your control.

Cost uncertainty

Unit rates and standing charges have moved sharply since 2021, and a budget set on last year's rate no longer holds for the next contract.

Electricity for businesses, pence per kWh: 14.8p in the first quarter of 2021, 28.4p at its highest in the fourth quarter of 2023, and 24.5p in the second quarter of 2026 (provisional). The average for businesses of every size, including the Climate Change Levy, excluding VAT. Source: DESNZ, Quarterly Energy Prices, table 3.4.2 (opens in a new tab), 29th September 2026.
Electricity for businesses, pence per kWh, by quarter
QuarterPence per kWh
2021 Q114.81p
2021 Q213.58p
2021 Q313.91p
2021 Q417.73p
2022 Q118.14p
2022 Q219.33p
2022 Q322.20p
2022 Q424.80p
2023 Q125.37p
2023 Q226.88p
2023 Q328.32p
2023 Q428.39p
2024 Q127.84p
2024 Q225.99p
2024 Q325.67p
2024 Q425.35p
2025 Q125.74p
2025 Q224.03p
2025 Q323.35p
2025 Q423.99p
2026 Q124.14p
2026 Q224.51p (provisional)

An unstable world

Much of the price is set abroad. Gas-fired power stations often set the price of electricity in Great Britain, and the gas price follows international events.

A distribution board in the Porta Romana plant room, with a column of digital meters down each side

Self-generation

Each kilowatt-hour (kWh) generated on your own roof is one you do not buy, and its cost is known from the day the system is commissioned. At ACO Technologies, 94.7% of the solar generated was used on site, avoiding £46,937 of grid import from December 2025 to 4th August 2026.

Potentia and ACO staff on the finished roof array at Shefford

Self-reliance

Storage and backup keep critical loads running through a power cut, and control lets the site choose when it draws from the grid. Awutu Winton Senior High School in Ghana had an unreliable grid supply and a costly diesel generator; we built it a solar and battery system.

Inverters and switchgear in a plant room

Four measures in every proposal

Every proposal reports four measures alongside the financial return.

Measured in hours

Supply continuity

The hours your critical loads are supported during a grid outage. It depends on backup capable inverters, island mode earthing, a segregated critical load board and, where fitted, generator integration.

Measured in % of annual kWh

Cost certainty

The share of your annual consumption supplied at a fixed or known unit cost, through self-generation, storage or a PPA. The rest stays exposed to the market.

Measured in kVA

Capacity

Headroom against your agreed import and export capacity. G100 export limitation and load control let a site add EV charging or electrified heat without waiting for network reinforcement.

Measured per asset

Visibility

Metered data from each inverter, battery and charger. Faults and underperformance are identified remotely, before they show on a bill.

Where we have delivered it

All case studies
Potentia engineers installing panels on the roof of Awutu Winton Senior High School, Ghana

Supply continuity

Awutu Winton Senior High School, Ghana

Solar and battery storage for a school of 600 pupils whose grid supply was unreliable, leaving it dependent on a costly diesel generator.

“Dan immediately offered his services pro bono and came out to visit the school with a promise to get us offgrid.”David Lunan, Charity Director, EDP
Drone view across the roof of The Natural Dispensary's warehouse in Stroud, with black solar panels around its rows of rooflights

Capacity

The Natural Dispensary, Stroud

Engineering consultant from the design stage: our modelling showed a smaller transformer would do, and we installed a 92.2 kWp rooftop system.

Drone view of Warminster Town Council's Community Hub, with solar across its roof beside the car park

Cost certainty

Warminster Town Council

A 26 kWp solar system with 20 kWh of battery storage on the council's Community Hub, which generated 25 MWh in 2025, 51% of the building's electricity use.

What we look at first

  • Twelve months of half-hourly consumption data
  • A schedule of critical loads and how long each must run
  • Outage history and the consequence of a loss of supply
  • Agreed import and export capacity, and the DNO position
  • Current tariff, contract end date and exposure to price change
  • How much of the load could be met by your own generation
  • Roof, plant room and switchgear survey

What you receive

  • An options appraisal with the four measures stated for each option
  • A budget cost and a financial model
  • The planning route and the network operator application required
  • A single line diagram of the proposed arrangement

This first stage is a fixed fee, credited against delivery.

DC isolators on a plant room wall

Talk to an engineer

Send the site address and a half-hourly data file. We respond within one working day.

Close view of a black solar array on a factory roof