Gloucestershire County Council: solar on 50 schools
Principal contractor for 0.5 MWp across 50 sites in the council's solar programme, delivered around the school calendar.

A 26 kWp solar system with 20 kWh of battery storage on the council's Community Hub, which generated 25 MWh in 2025, 51% of the building's electricity use.
Warminster Town Council took over the Community Hub building at Central Car Park from Wiltshire Council, and in 2024 sought tenders for solar panels on its roof. It's a community building, and the town's security is run from it.
We installed a 26 kWp SolarEdge solar system with 20 kWh of battery storage on the Community Hub in January 2025.
We look after all four of the council's arrays under an annual maintenance agreement that has run since December 2025 and has just been renewed, using Zervio's metering for asset management.
The systems are monitored remotely through our monitoring portal. Alerts are continuous and reviewed weekly, checking fault codes, inverter availability and generation against the expected yield for the season.
Every six months we carry out a visual inspection, electrical testing to BS 7671 and BS EN IEC 62446-1, and functional checks of the isolators, inverters and grid protection settings.
25 MWh
generated in 2025
51 %
of the building's electricity use in 2025



Delivered by the Potentia Engineering team

Principal contractor for 0.5 MWp across 50 sites in the council's solar programme, delivered around the school calendar.

A 10.92 kWp system on the school's flat roof, with nothing through the membrane, and solar panels with battery storage on six almshouses.