ACO Technologies: £46,937 of grid electricity avoided
245 kWp rooftop system. 183.6 MWh generated and 94.7% used on site from December 2025, when monitoring began, to 4th August 2026.
Every figure in our case studies says what it covers and where it comes from, and forecasts are labelled as forecasts. We have installed 6+ MWp to date.
11 case studies

245 kWp rooftop system. 183.6 MWh generated and 94.7% used on site from December 2025, when monitoring began, to 4th August 2026.

Principal contractor for 0.5 MWp across 50 sites in the council's solar programme, delivered around the school calendar.

A 10.92 kWp system on the school's flat roof, with nothing through the membrane, and solar panels with battery storage on six almshouses.

A 36.27 kWp rooftop system, over £30,000, delivered at no cost to the school: funded mainly by a local benefactor, with a contribution from Potentia.

A 1.1 MWp array removed and reinstated around a 30,000 m² roof replacement, with all 215 strings tested and signed off.

A 26 kWp solar system with 20 kWh of battery storage on the council's Community Hub, which generated 25 MWh in 2025, 51% of the building's electricity use.

76.26 kWp across two buildings, 186 panels, with a 15.36 kWh battery, installed in under three weeks.

Engineering consultant from the design stage: our modelling showed a smaller transformer would do, and we installed a 92.2 kWp rooftop system.

A solar and battery system for a school of 600 pupils in Ghana, whose grid supply was unreliable. Funded with our partners and installed by our own engineers.

A 9.135 kWp solar system with a 10 kWh battery, sized from the household's energy use, forecast to generate about 8,797 kWh a year.

Three 22 kW chargers for Porta Romana in Farnham, metered to run on spare power from the solar array we installed a few months before.